About
Anchors
Slimline® TAC
Slimline® QuickSet™ TAC
Standard B2 TAC
Quarter-Turn Tension Anchor
Unique Sizes & Applications
Resources
Blog
Videos
FAQs
CFD Study
ROI Calculator
Become a Dealer
Contact Us
Blog
TAC Setting and Releasing Instructions
August 29, 2018
Like this post? Spread the word.
Post
Share
Publish
Copy
URL Copied
TECHTAC® BLOG
Featured Posts
Make sure you don't miss any of these!
June 26, 2024
Gas Locking in Oil Wells: Causes, Consequences and Solutions
Gas locking in oil wells is a common challenge in the oil industry. In this article, we will delve into the intricacies of gas locking, its...
View More
December 6, 2023
Original Manufacturer vs. Aftermarket Parts: Which are Best for Your Downhole Equipment?
When it’s time to repair or rebuild a piece of downhole equipment, one of the main questions an operator needs to answer is...
View More
September 12, 2023
The High Cost and Impact of a Stuck Tubing Anchor Catcher in an Oil Well
Oil drilling is a complex and costly process, with numerous challenges and risks involved. One of the potential problems that can occur...
View More