TechTAC® Blog

Product News

New product releases or product improvements

February 23, 2026

New, Patent-Pending Tubing Anchor Catcher Now Available from TechTAC

After more than two years of development and testing, the innovative new tool has the potential to boost production and mitigate gas... View More
February 10, 2026

An Ingenious Way to Visualize the Increased Flow-by Area of the Slimline TAC

The Slimline® TAC has lowered lifting costs and improved production for thousands of wells across North America and beyond. Those... View More
January 19, 2026

Boosting Production Even in the Problem Well

Every production company has at least one problem well. A well that’s almost more trouble than it’s worth. Persistent... View More
December 29, 2025

Need 8-5/8” TACs? TechTAC Has Them!

Most tubing anchor catchers are designed to support wells with 4.5” to 7.0” casings, plus the occasional 7-5/8” variety. However,... View More
October 24, 2025

The Slimline TAC: Ideal for Harsh Downhole Conditions

In wells with harsh downhole conditions, such as high reservoir pressures and temperatures, aggressive fluid chemistries, severe... View More
September 8, 2025

New TechTAC Anchor Combines Slimline Design with Full Bore ID

For years the Slimline® Tubing Anchor Catcher has helped petroleum engineers and field personnel mitigate the effects of gas... View More